Hi Mark-
I have 2 systems running HAL and ML in parallel. They used to be on the same machine, but now a NUC runs ML at one site and HAL at the other. I primarily use touch screens to run ML, ipads mostly but it will run on anything the way my supplier has set it up.
http://shore2shore.ca/
ML runs most of it with HAL answering the phone and doing the schedule stuff.
I too would like to know the level of interaction. Are the systems synergistic or, as I am thinking, antagonistic?
ML will have scheduling soon and I don't know the applicability of HAL in that scenario. There must be a higher level of integration.
PM me if you want details.
Anyone else out there? See my original post.
bob